The duration of a project is determined by 3 factors:

  • How much of the project is fabricated?  In the case of custom cabinets, the delivery date is normally 2 weeks after they are designed and ordered.
  • How much structural, plumbing, or electrical repair needs to be completed on the existing home before new construction can begin?
  • What times and dates are we able to access the job site.  Our typical work week is Monday through Friday, 9am to 5pm.